SEWER CONSTRUCTION — all operations — including construction of laterals and tunneling at street crossings — employees whose regular hourly wage equals or exceeds $38.00 per hour
Assignment of this classification is subject to verification at the time of final audit that the employee’s regular hourly wage equals or exceeds $38.00 per hour. The payroll of an employee whose regular hourly wage is not shown to equal or exceed $38.00 per hour shall be classified as 6307, Sewer Construction.
This classification applies to the construction of sewer main lines and laterals from the main line to the property line, and includes incidental trenching, shoring and tunneling at street crossings. This classification also applies to the installation of sewer lines within property lines when the sewer pipe exceeds 6" in diameter. This classification also applies to the construction of closed concrete culverts, monolithic or concrete pipe storm drains and catch basins and the installation of septic tanks and cesspools.
The installation of sewer lines within property lines using pipe that does not exceed 6" in diameter shall be classified as 5183(1)/5187(1), Plumbing.
Shown below is the previously published phraseology and footnote | Effective Date |
---|---|
Phraseology:
SEWER CONSTRUCTION — all operations — including construction of laterals and tunneling at street crossings — employees whose regular hourly wage equals or exceeds $39.00 per hour Assignment of this classification is subject to verification at the time of final audit that the employee’s regular hourly wage equals or exceeds $39.00 per hour. The payroll of an employee whose regular hourly wage is not shown to equal or exceed $39.00 per hour shall be classified as 6307, Sewer Construction. Footnote:
This classification applies to the construction of sewer main lines and laterals from the main line to the property line, and includes incidental trenching, shoring and tunneling at street crossings. This classification also applies to the installation of sewer lines within property lines when the sewer pipe exceeds 6" in diameter. This classification also applies to the construction of closed concrete culverts, monolithic or concrete pipe storm drains and catch basins and the installation of septic tanks and cesspools. The installation of sewer lines within property lines using pipe that does not exceed 6" in diameter shall be classified as 5183(1)/5187(1), Plumbing. | 9/1/2022 |
The Classification Search was developed by the WCIRB for your convenience to help you identify Standard Classifications based on keywords or a classification code. However, you cannot rely solely on the Classification Search and must make an independent assessment when determining the appropriate classification(s) assignable to a risk in accordance with the USRP.