OIL OR GAS PIPELINE CONSTRUCTION — all operations
This classification applies to the construction of above and below ground oil or gas pipelines for other concerns on a fee basis. Construction operations include but are not limited to constructing pipe supports, excavating and backfilling trenches, connecting pipe and fittings and testing pipelines for leaks.
Pile driving, dredging or tunneling shall be separately classified.
Shown below is the previously published phraseology and footnote | Effective Date |
---|---|
Phraseology: Footnote: Pile driving, dredging or tunneling shall be separately classified. | 1/1/2016 |
The Classification Search was developed by the WCIRB for your convenience to help you identify Standard Classifications based on keywords or a classification code. However, you cannot rely solely on the Classification Search and must make an independent assessment when determining the appropriate classification(s) assignable to a risk in accordance with the USRP.